The challenge:
Cost effective roof structures for multiple use buildings
in a prison environment.
The solution:
A design and construction package to supply an
engineered steel roof truss configuration.
The highlights:
- Liaison with Multiplex to establish package parameters
- Use of LYSAGHT SUPRATRUSS® system supported by
LYSAGHT SUPRACADD® detailing software
- Liaison with air conditioning and other trades to create
roof space areas for ducting, plant and services
- Final design optimised by application of extensive
framing experience
- Coordination of multiple fabricators and carpenters
to assemble and install the complete truss system
- Management of materials shipment to correctional
complex secure area
- On site fabrication of completed trusses and staged
installation
- Total number of trusses: 315
- Completed roof structure engineered for strength,
with no risk of adding fuel to any fire
Key impact on project
Package delivery on lump sum terms for reduced head
contractor management overhead.
For more information contact:
Brent Poll, Manager, Lysaght Design and Construction
Mobile:
0417 057 396
Email:
brent.poll@bluescopesteel.com